Cell Fill Procedure


Initial State :
System should be pumped out
All valves are open except BV14 (The valve between bellows and roughing pump)
All bottles are closed
Turbo pump is on
Purifier heaters are on
Ion Pump is on

Fill Procedure
  1. Close BV15 and GV1
  2. Put turbo pump in "Standby mode"
  3. Turn ion pump off
  4. Close BV1, BV2, BV3, BV4, BV7, BV10 and BV13
  5. Open bottle 1
  6. Close bottle 1
  7. Open DV1
  8. Gently open BV2, flow gas slowly
  9. Close BV11
  10. Record pressure and temperature
  11. Close BV12
  12. Open BV15
  13. Close DV5
  14. Slowly open BV14 until Pirani gauge 1.0e-2 torr
  15. Close BV14
  16. Open DV5
  17. Open GV1
  18. Pump until Cold Cathode Gauge is at 1e-5 mbar or so